Small Scaled Process Solutions
Image
Description

The Flux Flux warming up by performing a pre-install a Flux warming up system 1: 1 should be available immediately after the replacement without extra Warming up


Effect
  • Type effectiveness : Down time to remove the utilization rate improved 3.2%
  • Intangible effects : Loss time being of the worker is removed along with increased production due to improved capacity utilization naturally by the inspection focused on the material during that period contributed to the improving quality